Construction: March 6, 2023 - March 31, 2023
About TJPA
-
Downtown Rail Extension (DTX) / The Portal
Land Surveys between 4th and 7th Streets along Townsend Street and within Caltrain Station Tracks:
Downtown Rail Extension (DTX) / The Portal
Land Surveys between 4th and 7th Streets along Townsend Street and within Caltrain Station Tracks:
STAY CONNECTED
Sign up for our mailing list
to receive updates from the TJPA.