Construction: April 3, 2023 - April 28, 2023
About TJPA
-
Downtown Rail Extension (DTX) / The Portal
Land Surveys between 4th and 7th Streets along Townsend Street and within Caltrain Station Tracks
Downtown Rail Extension (DTX) / The Portal
Land Surveys between 4th and 7th Streets along Townsend Street and within Caltrain Station Tracks
STAY CONNECTED
Sign up for our mailing list
to receive updates from the TJPA.